HS2 Case Studies

Experience Counts

A-Plant has the experience, expertise and product range to service all stages of the HS2 project from enabling works through to main civils. The following case studies demonstrate our involvement with HS2 so far.

Lux Traffic Management

Traffic Management Solutions

Old Oak Common Lane

Having developed a relationship with A-Plant LUX on a previous project, the HS2 delivery team recommended A-Plant LUX to Geotechnical Engineers, BAM Ritchies, to undertake the traffic management works for their Ground Investigation project along a 1 mile stretch of Old Oak Common Lane.

Download Case Study


Tilehill Quarry

Temporary Roadways

Tilehill Quarry

The customer required temporary access to transport plant, equipment and personnel across a live quarry environment. The variable stability of ground due to clay backfill and highwater table caused a very wet surface which would have normally been unable to traverse.

Download Case Study